Power plant, type, capacity Completion time Scope of services
  Start End  
PORĄBKA-ŻAR / 500 MW
pumped – storage hydro power plant
2017 2019 Comprehensive replacement of 2 ball valves (Dn 1650, Pn 6.6 MPa) for hydro turbine sets TZ3 & TZ4 - technical documentation, supply, assembly and start-up.
2014 2016 Comprehensive replacement of 2 ball valves (Dn 1650, Pn 6.6 MPa) for hydro turbine sets TZ1 & TZ2 - technical documentation, supply, assembly and start-up.
TUPOŁANG / 180 MW
hydro power plant
(Republic of Uzbekistan) 
2015 2020 GENERAL DESIGNER - extension and replacement of the electrical and mechanical equipment. A capacity increase of the small hydro sets (from 2 x 7.5 MW to 2 x 15 MW). Mounting of the new hydro sets (2 x 75 MW). 
GŁĘBINÓW / 3040 kW
hydro power plant 
2013 2016 Comprehensive modernization of a power plant including a replacement of 2 hydro turbine sets and a construction of new substation.
OTMUCHÓW / 7500 kW
hydro power plant 
2012 2014 Comprehensive modernization of a power plant including a replacement of 3 hydro turbine sets.
ŻYDOWO / 150 MW
pumped – storage hydro power plant
2008 2013 Comprehensive modernization of a power plant and a head canal. Investor Representation.
MALCZYCE / 9000 kW
hydro power plant
2005 2018 Delivery and assembly of a technological equipment.
ŻARNOWIEC / 680 MW
pumped – storage hydro power plant
2010 2011 Comprehensive modernization of HZ-2 hydro turbine set.
2009 2010 Comprehensive modernization of HZ-1 hydro turbine set.
2008
2009
Comprehensive modernization of HZ-3 hydro turbine set.
2007 2008 Comprehensive modernization of HZ-4 hydro turbine set.
ŻARNOWIEC / 680 MW
pumped – storage hydro power plant
2016 2016 Reconstruction of mastic seal of the upper reservoir (area of around 70 000 m2).
2006 2006 Reconstruction of asphaltic concrete lining of the upper reservoir (area of around 240 000 m2).
DYCHÓW / 90 MW
storage hydro power plant
2003 2005 Comprehensive modernization of a power plant.
CZCHÓW / 8 MW
hydro power plant
2004 2005 Delivery, assembly and start-up of a turbine controller set.
SOLINA / 200 MW
storage hydro power plant
2001 2003 Investor Representation and General Supplier. Comprehensive modernization and expansion of a 110 kV substation.
PORĄBKA-ŻAR / 500 MW
pumped – storage hydro power plant
2001 2002 Modernization of a settlement system and a 220 kV substation.
TOPOLA / 1560 kW
hydro power plant
1994 2002 Construction of a plant`s technological equipment excluding a civil part.
SOLINA / 200 MW
pumped – storage hydro power plant
2000 2002 Comprehensive modernization and total output increase from 137.6 MW to 200.2 MW.
ROŻNÓW / 50 MW
hydro power plant
1996 2000 Comprehensive modernization of a power plant - 4 hydro turbine sets.
MYCZKOWCE / 8400 kW
hydro power plant
1998 2000 Comprehensive modernization of a power plant - (2 x 4.2 MW).
ŁÓDŹ IV / 700 MW
combined heat and power plant
1996 1999 Comprehensive modernization of 4 electrostatic precipitators for boilers OP 230 and WP 120.
GORZUPIA / 4 x 420 kW
hydro power plant
1997 1998 Project management.
SIEMIANÓWKA / 160 kW
hydro power plant
1995 1996 Design, basic deliveries and start-up.
PORĄBKA / 12,5 MW
hydro power plant
1994 1996 Modernization of a power plant (mechanical, electrical and structural part).
PORĄBKA-ŻAR / 500 MW
pumped – storage hydro power plant
1995 1995 Replacement of a sealing in the upper reservoir escarpment.
SROMOWCE / 2080 kW
hydro power plant
1993 1994 Construction of a plant`s technological equipment excluding a civil part.
NYSA / 270 kW
hydro power plant
1993 1993 Comprehensive replacement of a hydro turbine set.
 
Strona główna Completed projects General Investment Procurement

Snapshots

There are no translations available.

W dniu 3 czerwca 2008 roku na terenie Elektrociepłowni Siekierki Vattenffal Heat Poland S.A. dokonał wmurowania aktu erekcyjnego pod budowę akumulatora ciepła. Jako Energoprojekt-Warszawa SA jesteśmy wspólnie ze szwedzką firmą konsultingową ÄF-Process AB autorami tego projektu od fazy koncepcji do dokumentacji wykonawczej włącznie.

email us: pulapka@energoprojekt.pl pulapka@energoprojekt.pl