FGD Systems PDF Print E-mail

Contracting party - Połaniec Power Plant – GDF Suez Energia Polska Group

Contract type
Completion
time
Completion of numerous works for the Flue Gas Desulphurization (FGD) system for 4 x 225 MW power units including:
  • Preparing of a feasibility study for the construction of FGD system that covers:
    • environmental protection matters
    • desulphurization technology analysis
    • matters related to limestone, lime, sorbent and sewage management
    • layout with included FGD components
    • economic part, analyzing the investment costs, operating costs, financing sources and analysis credit possibilities
  • Acting as the Investor’s Technical Advisor when selecting the FGD technology supplier.
  • ENERGOPROJEKT – WARSZAWA SA participated in the entire designing process related to the construction of Limestone Processing Plant and Lime Receiving and Storage System including the preparation of:
    • technical concept
    • basic engineering
    • Construction Permit Design
    • comprehensive detailed engineering and as-built documentation
ENERGOPROJEKT – WARSZAWA SA participated in the construction of this plant carrying out the project architects supervision.
1992-1999

Contracting party - RAFAKO S.A. Boiler Engineering Company

Contract typeCompletion
time
Comprehensive technical documentation related to the FGD systems at the Bełchatów Power Plant covering the preliminary design and multi-discipline detailed engineering for the main part of the FGD system – absorbent center. 1997-2001
Construction of FGD systems for the power units Nos. 1 - 4 (4 x 200 MW) at the Pątnów Power Plant
  • basic engineering (including Construction Permit Design)
  • multi-discipline detailed design

2005-2006
2006-2007
Construction of FGD system for the Ostrołęka „B” Power Plant
  • Construction Permit Design
  • multi-discipline detailed design
  • as-built documentation
2005-2007
Development of FGD systems for the power units Nos. 8, 10, 11 i 12 (4 x 360 MW) at the Bełchatów Power Plant
  • Construction Permit Design
  • basic engineering and multi-discipline detailed design
2006-2007
Construction of FGD systems for the power units Nos. 3 and 4 (2 x 360 MW) at the Bełchatów Power Plant
  • Construction Permit Design
  • Preliminary design
  • multi-discipline detailed design
  • as-built documentation
2004-2007
Modernization of FGD systems for the power units Nos. 5 and 6 (2 x 360 MW) at the Bełchatów Power Plant
  • Construction Permit Design and basic engineering
  • detailed design and as-built documentation
2013-2014
Construction of FGD systems for the power units Nos. 1 and 2 (2 x 360 MW) at the Bełchatów Power Plant
  • Construction Permit Design
  • detailed design (electrical part and site arrangement)
2010-2012
Construction of FGD system for a 858 MW supercritical power unit at the Bełchatów Power Plant
  • preliminary design
  • multi-discipline detailed design for selected buildings and steel structures
  • as-built documentation
2006-2009
Construction of FGD system (wet method) at the Gdańska CHP Plant - EDF Group
  • Construction Permit Design and basic engineering
  • detailed design and as-built documentation
2013-2015
Construction of FGD system (wet method) at the Wrocławskie CHP Plants KOGENERACJA S.A. - EDF Group
  • Construction Permit Design and basic engineering
  • detailed design and as-built documentation
2013-2015

Contracting party - PGE Bełchatów Power Plant

Contract typeCompletion
time
  • Technical and Economic Outlines for the construction of FGD systems at the Bełchatów Power Plant.
  • Location study for the construction of FGD system for power units Nos. 8 & 9.
  • Location study for the construction of FGD system for power units Nos. 11 & 12.
  • Construction Permit Design – FGD system for power units Nos. 8, 10, 11, 12.
  • Analysis of the possibilities of constructing FGD system for power units Nos. 1, 4.
  • Study works and technical and economic analysis for taking the decision on FGD system construction (wet method) for power units Nos. 3 and 4.
  • Location study for the construction of FGD system for power units Nos. 1 and 2.
  • Environment Impact Assessment – construction of FGD system for power units Nos. 1 and 2.
1990
1992
1994
1994
2001
2003
2005
2008

Contracting party - ELBIS Ltd. (previous Bełchatów Power Plant II)

Contract type
Completion
time
Acting as the Investor’s Technical Advisor for the turnkey projects (EPC services) for a 858 MW supercritical power unit located at the Bełchatów Power Plant.
  • Scope of a new 858 MW power unit design covers necessary auxiliary systems, including: FGD system (selected technology – wet method)
2001-2005

Contracting party - Fortum Engineering Ltd. (Finland)

Contract type
Completion
time
Development of technical documentation for the construction of FGD system for power units Nos. 9 & 10 (2 x 500 MW) at the Kozienice Power Plant including:
  • complete detailed architectonic and civil engineering
  • part of electrical systems
  • design of process water supply installation for FGD system
2000

Contracting party - Kozienice Power Plant

Contract type
Completion time
Acting as the Investor’s Technical, Economic and Legal Consultant for the Kozienice Power Plant during the public tender for the selection of General Contractor of FGD system for power units Nos. 4-8 (4 x 200 MW).
2002-2003

Contracting party - Pątnów – Adamów – Konin Power Plants Group

Contract type
Completion time
Construction of FGD systems  for power units Nos. 1-6 (6 x 200 MW) at the Pątnów Power Plant – technical concept

Development of Terms of Reference for the selection of General Contractor of a FGD system for the power units Nos. 1-4 (4 x 200 MW) at the Pątnów Power Plant.

Development of Terms of Reference for the selection of General Contractor of a Lime Dehydration and Storage System and a FGD sewage treatment system at the Pątnów Power Plant.

2001-2003


Contracting party - Energa Ostrołęka Power Plants Group

Contract type
Completion
time
Construction of a FGD system for the Ostrołęka „B” Power Plant.
  • Feasibility study for the construction of FGD system under the Business Plan for the Energa Ostrołęka PPs
  • Construction Permit Design, detailed engineering and as-built documentation
  • Development of Terms of Reference for the  selection of General Contractor of a FGD II
  • Construction Permit Design for the construction of FGD II


2003
2005-2007
2013-2014
2014
 


Contracting party - EDF Group

Contract type
Completion
time
Feasibility study for the construction of a FGD system (wet method) at the Rybnik Power Plant 2004

Contracting party - Vattenfall Heat Poland S.A

Contract type
Completion
time
Technical concept for the construction of FGD system  for K1 boiler at the Siekierki CHP Plant.
Development of the Terms of Reference for the tender for the selection of General Contractor of FGD system for K1 boiler – OP 230.
Construction of FGD system for the Siekierki CHP Plant:
  • technical concept with economic analysis
  • development of an Application to obtain a decision of the land development conditions
  • development of the ToR for the tender for the selection of General Contractor
2006-2007

 
Strona główna Completed projects FGD Systems

Snapshots

There are no translations available.

W dniach 24-25 listopada odbyło się w Toruniu III Forum Ochrony Środowiska poświęcone zagadnieniom ochrony środowiska w aspekcie nowych regulacji prawnych, wdrażanych technologii środowiskowych oraz konsekwencji dla przemysłu wynikających z konkluzji BAT. Energoprojekt-Warszawa SA reprezentowany był przez Pana Wojciecha Orzeszka – Kierownika Pracowni Ochrony Środowiska, który wygłosił referat pt. „Konkluzje BAT dla ciepłownictwa i energetyki. Aspekty prawne i techniczne – najnowsze informacje”.

email us: pulapka@energoprojekt.pl pulapka@energoprojekt.pl