Kozienice Power Plant - ENEA Group

  • Basic engineering, Construction Permit Designs (substitutes), detailed design (cooling water system, raw water system, coal supply and power output system) and as-built documentation for the construction of a 1075 MWe supercritical power unit, fired with hard coal (2011÷2017)
  • Application for a change of integrated permit for the environmental usage for the power units Nos.1÷10 and a new power unit No.11 with a capacity of 1075 MWe (2017)
  • Multi-discipline detailed design for the modernization of furnace wastes yard (2016)
  • Multi-discipline detailed design for the upgrade / reconstruction of the Main Building (2011)
  • Construction Permit Design for the construction of a 1075 MWe supercritical power unit, fired with hard coal (2009÷2011)
  • Technical concept and multi-discipline detailed design for the modernization of slag and ash landfill (2011)
  • Multi-variant concept design and detailed design for the modernization of the Main Building regarding, in particular, fire fighting requirements (2009)
  • Multi-discipline technical documentation (concepts, basic and detailed design) necessary for the performance of gradual and comprehensive modernization of the 200 MW power units (1995÷2004)
  • Multi-discipline technical documentation (concepts, basic and detailed design) necessary for the performance of comprehensive modernization of the 2 x 500 MW power units (1997÷2001)
  • Design concept and Construction Permit Design related to the project “Construction of the Water Demineralisation Station DEMI II for raw water pipelines 2 DN 350 from the pumping station to the new building, and feed pipelines DN 300 evacuating industrial waste from designed Station to the slurry pumping stations” (2002÷2003)
  • Multi-discipline technical documentation necessary to perform a comprehensive modernization of the coal handling system for the 8 x 200 MW power units (2000÷2002)
  • Multi-discipline technical documentation (concepts, Construction Permit Design and detailed design) for the replacement of electrostatic precipitators at the 200 MW power units no. 3, 7, 8 (1995÷1996)

Bełchatów Power Plant - PGE GiEK S.A.
  • Construction Permit Design and multi-discipline detailed design for an existing air compressor building and a new air driers building in the scope of reconstruction of air compressor system for the ash removal installation (2016)
  • Detailed design to adapt the "Zwałowisko" combustion waste dump for operation at the 2nd and 3rd stages (2013, 2015)
  • Construction Permit Design, multi-discipline detailed design and as-built documentation for the modernization of flue gas reheating system of a FGD System for the power units Nos. 8÷12 (2011÷2015)
  • Basic engineering, Construction Permit Design and comprehensive detailed design for the modernization of a FGD plant for the power units Nos. 5 & 6 (2013÷2014)
  • Multi-discipline technical documentation (Construction Permit Design and detailed design for selected buildings and engineering structures) for the construction of a 858 MW supercritical power unit (2006÷2011)
  • Construction Permit Design (2010) and detailed design (electrical part and site arrangement) for the construction of a FGD System for power units No. 1 & 2 (2011÷2012)
  • Construction Permit Design upgrade for the construction of a FGD System for a 858 MWe supercritical power unit (2010)
  • Multi-discipline technical documentation (basic engineering, detailed design and as-built engineering) for the construction of a FGD System for a 858 MW supercritical power unit (2006÷2010)
  • Multi-discipline technical documentation (Construction Permit Design and detailed design) for the redevelopment of the coal dumping building P I/6 and coal sorting building P III/10 (2009)
  • Multi-discipline technical documentation (basic engineering, detailed design and as-built documentation) for the modernization of live steam pipelines, reheated steam pipelines, flue gas reheating steam pipelines and feed water pipelines for boiler BB-1150 of a 360 MW power unit (2006÷2008)
  • Multi-discipline technical documentation (detailed design, documentation for licenses, workshop designs and as-built documentation) for the modernization of HP and MP pipelines of 18K370 turbine at a 360 MW power unit no. 3 (2007÷2008)
  • Multi-discipline technical documentation (Construction Permit Design, detailed design and as-built documentation) for the project “Construction of the water intake on Krasówka river” for the needs of the power plant water management (2002÷2005)
  • Multi-discipline technical documentation (Construction Permit Design, detailed design and as-built documentation) for the modernization of the Water Treatment Station for boiler cycle at the power plant (2002÷2003)
  • Multi-discipline technical documentation (concepts, basic engineering, Construction Permit Design and detailed design) required to perform the modernization of the existing and construction of the new system of furnace ash hydraulic evacuation to the new landfill (1998÷2003)

Pątnów Adamów Konin Power Plants Group
  • Technical concept, basic engineering, Construction Permit Design and multi-discipline detailed design to adapt an existing turbine set TG-6 to the co-operation with a heat distribution system at the Konin CHP Plant (2016÷2017)
  • Feasibility study "Adaptation of the ZE PAK Power Plants and the Pątnów II Power Plant to the requirements of BAT conclusions for the LCP" (2016÷2017)
  • Multi-variant concept and detailed design for the modernization of transformer`s oil drip-pans at the Adamów Power Plant (2009)
  • Multi-discipline technical documentation (concepts, Construction Permit Design, detailed design and as-built documentation) for the construction of a 464 MW supercritical power unit at the Pątnów Power Plant (2001÷2008)
  • Modernization of the central cooling water pumping stations no. 1 and 2 for the 200 MW power units at the Pątnów Power Plant (2006÷2007)

Połaniec Power Plant – GDF Suez Energia Polska Group
  • Detailed design in the electrical part for the assembly of two air compressors in a boiler house No. 8 for the SCR installation (2017)
  • Detailed design in the electrical part for the assembly of a new air blower (90 kW) at the 190 MWe power unit (2016)
  • Concept design of the expansion of electrical building for the needs of the unit control room (2015)
  • Detailed design in the electrical part for the replacement of a 6 kV power unit switchgear (2015)
  • Detailed design in the electrical part, regarding the start-up of a complete CFB boiler for a 190 MWe power unit (2011÷2012)
  • Detailed design in the electrical part for the modernization of the 6 kV and 0.4 kV switchgears (2011÷2013)
  • Detailed design in the electrical part for the replacement of six 6 kV switchgears (2009)
  • Multi-discipline technical documentation (concept, Construction Permit Design and detailed design) for the construction of central control room and the guaranteed power supply system (2002÷2003)

Warsaw CHP Plants - PGNiG Termika S.A. 
  • Detailed design in the electrical part for the modernization of the goods and passenger lifts M1 and M2 in the main building at the Siekierki CHP Plant (2017)
  • Application for a change of integrated permit for the environmental usage for the planned new gas - steam combined cycle unit at the Żerań CHP Plant (2017)
  • Detailed design in the electrical part of an emergency feeding of the lifts K1-3, M3 and M5 at the Siekierki CHP Plant (2016)
  • Variant preliminary documentation and technical documentation for the modernization of a steam collector (9MPa) at the Żerań CHP Plant (2016)
  • Variant concept documentation and technical documentation for the modernization of basic and emergency lighting systems for the unit boilers K10-11 and K14-15 at the Siekierki CHP Plant (2016)
  • Detailed design in the electrical part concerning the replacement of the OR6 6 kV switchgear at the Kawęczyn CHP Plant (2015)
  • Preparation of a bid documentation together with the consultant services (as a Technical Advisor) for the project: "Adjustment of the existing power evacuation systems to the new 110 kV switching station as part of the connection of the new CCGT unit to the power transmission grid" (2014÷2015)
  • Technical documentation (required for agreements with the Office of Technical Inspection) of condensate evacuation from a flue gas denitrification system and a boiler soot blower system at the Siekierki CHP Plant (2012).
  • Detailed design for the needs of upgrading a EP25 feed water pump drive at the Żerań CHP Plant (2012)
  • Construction Permit Design for the construction of a 480 MWe supercritical power unit at the Siekierki CHP Plant (2009)
  • Multi-discipline detailed design for the upgrading of a live steam header and connecting a new turbine set Tz12 at the Żerań CHP Plant (2009)
  • Multi-discipline technical documentation (Construction Permit Design and detailed design), including the preparation and acquiring of official permits for the construction of a heat accumulator system at the Siekierki CHP Plant (2006÷2009)
  • Multi-discipline technical documentation (basic engineering, detailed design and as-built documentation) for the modernization of district heating water pumps system at the Siekierki CHP Plant (2005)
  • Multi-discipline technical documentation (Construction Permit Design and detailed design) for the construction of fluidized bed boilers “A” & “B” at the Żerań CHP Plant (1994÷2001)
  • Complete design of retention tank ZRP-3 (V = 2800 m3) for a fly ash from the fluidized bed boilers “A” & “B” at the Żerań CHP Plant (2000÷2001)

Elektrownia Północ Power Plant
  • Basic engineering and Construction Permit Design for the construction of a 2 x 1000 MWe supercritical power plant, fired with hard coal (2010÷2011).

ENERGA Ostrołęka Power Plants
  • Investor`s Technical Advisor during the public tender for the selection of General Contractor of a new Ostrołęka "C" Power Plant with a capacity of 1000 MWe, fired with hard coal (2016÷2017)
  • Technical documentation of the boiler expanders blow (power units Nos. 1-3) at the Ostrołęka "B" Power Plant (2016)
  • Detailed design in the electrical part for the modernization of the 0.4 kV K-1A, K-1B, K-2A, K-2B, K-3A, RRA, RRB switchgears at the Ostrołęka "B" Power Plant (2016)
  • Detailed design in the electrical part for the SCR installation (power unit No. 3) at the Ostrołęka "B" Power Plant (2016)
  • Technical concept of the construction of a new power unit with a capacity of 650 MWe, fired with hard coal (2015)
  • Basic engineering and detailed design in the electrical part for the SCR installation - boilers OP-650 type (2015)
  • Basic engineering and detailed design in the electrical part concerning the modernization of electrostatic precipitators (2015)
  • Construction Permit Design for the construction of a FGD plant II at the Ostrołęka "B" Power Plant (2014)
  • Construction Permit Design and detailed design for the construction of an emergency power supply system for selected devices, in case of a "black-out" at the Elektrownia "B" Power Plant (2013)
  • Basic engineering and comprehensive detailed design for the modernization of a 0.4 kV switchgear at the Elektrownia "B" Power Plant (2013)
  • Construction Permit Design of the biomass supply logistics and combustion waste collection yard from the designed Ostrołęka "C" Power Plant with a capacity of 1000 MWe (2012)
  • Concept and basic engineering for emergency power supply system of devices installed at the Ostrołęka "B" Power Plant (2012)
  • Construction Permit Design for the construction of combustion wastes emergency landfill for Ostrołęka "C" Power Plant (2011)
  • Construction Permit Design for the construction of a 1000 MWe supercritical power unit, fired with hard coal (2010)
  • Multi-discipline technical documentation (Construction Permit Design, detailed design and as-built documentation) for the construction of a FGD System at the Ostrołęka “B” Power Plant (2005÷2007)

Lublin – Wrotków CHP Plant - PGE GiEK S.A.


Construction of a gas - steam combined cycle unit with an output of 235 MWel and 150 MWth at the CHP plant (1996÷2005)
The work scope included:
  • pre-feasibility study,
  • feasibility study in the technical part along with the environmental impact assessment,
  • management, on behalf of the Investor, of a tender for the selection of General Contractor of a gas - steam combined cycle unit,
  • Construction Permit Design, detailed design and as-built documentation,
  • consultancy regarding the operation and economical and finance monitoring of a gas - steam combined cycle unit.

Rzeszów CHP Plant - PGE GiEK S.A.

Construction of a gas - steam combined cycle unit with an output of 101 MWel and 76 MWth at the CHP plant (1998÷2003)
The work scope included:
  • pre-feasibility study,
  • feasibility study,
  • management, on behalf of the Investor, of a tender for the selection of General Contractor of a gas - steam combined cycle unit, along with the development of Terms of Reference, bids completeness evaluation and bidder’s selection, as well as preparation of the contract with the General Contractor,
  • Construction Permit Design, detailed design and as-built documentation (thermal-process part in the scope of steam and water systems as well as gas and oil pipelines).

Dolna Odra Power Plants Group - PGE GiEK S.A.

  • Feasibility study for the construction of two gas - steam combined cycle units with a capacity of  2 x 500 MWe (2017-2018)

Pomorzany Power Plant - PGE GiEK S.A.
  • Construction Permit Design for the construction of a 240 MWel gas - steam combined cycle unit (2012)

Municipal District Heating Enterprise in Łomża City
  • Construction Permit Design for the construction of a high efficiency co-gen power unit fired with biomass at the Heating Power Plant (2017)

Municipal District Heating Enterprise in Konin City
  • Technical concept, Construction Permit Design, decision on environmental conditions and multi-discipline detailed design for the construction of a Geothermal Heating Plant (2017)

District Heating Enterprise in Wołomin City
  • Technical concept for the adaptation of an enterprise to the new emission standards and requirements of the BAT conclusions, and the upgrade of "Analysis on assembly of two engines fired with natural gas at the Municipal Heating Plant" (2016÷2017)

RADPEC Municipal District Heating Enterprise in Radom City
  • Strategy for the enterprise concerning co-gen development and hard coal demand decreasing (2016)

M + W Central Europe in Biłgoraj City
  • Multi-discipline concept design and Construction Permit Design for the construction of a high efficiency co-gen power unit with a capacity of 14.8 MW fired with wood chips (2016)

Municipal District Heating Enterprise in Żyrardów City
  • Concept for the development of the existing thermal plants as a part of the municipal heating system in Żyrardów City (2017-2018)
Municipal District Heating Enterprise in Suwałki City
  • Concept for the adaptation of an enterprise to the new emission standards and requirements of the BAT conclusions (2016)

GEOTERMIA PODHALAŃSKA Municipal District Heating Enterprise
  • Construction Permit Design and multi-discipline detailed design for the investment project mentioned below (2016)
  • Investor`s Technical Advisor services and the preparation of a concept for the assembly of a thermal pumps`s compressing system (water-water type) as a part of a district heating system at the Geothermal Heating Plant in Szaflary City (2015)

ANWIL S.A. - ORLEN Group
  • Detailed design for selected buildings and engineering structures of a 463 MWel gas - steam combined cycle unit (2013)

TAURON Ciepło S.A. - TAURON Group

  • Environment Impact Assessment for the Katowice CHP Plant - reconstruction of installed power generation capacity (2017)
  • Construction Permit Design and comprehensive detailed design for the construction of a BC 50 thermal power unit with fluidized bed boiler and heating condensing turbine at the Tychy CHP Plant (2012÷2015)

Żychlin Heating Plant
  • Basic engineering, construction permit design for installation of two gas engines of combined power of 4 MWel/3.75 MWth and biomass-fired boiler with discharge and condensing turbine 2.7 MWel/5.2 MWth (2014)

TAMEH Polska
  • Multi-discipline detailed design for the construction of a steam turbine set with a capacity of 55 MW together with the auxilliary installations at the Kraków CHP Plant (2017)
  • Application for a change of integrated permit for the environmental usage for the Nowa CHP Plant and the Kraków CHP Plant (2017)
  • Detailed electrical design for a power output system from 50 MW pass-out and condensing turbine generator set at the Nowa CHP Plant (2014)

Rybnik Power Plant - PGE Energia Ciepła
  • Due dilligence related to the technical, environmental and commercial aspects (2017)
  • Construction Permit Design for ammonia water tanks (construction of a Low NOx installation for boilers K7 & K8) (2013)
  • Basic engineering for the cooling water pipelines inside a turbine hall of a 900 MWe supercritical power unit, fired with hard coal (2012)

Opole Power Plant - PGE GiEK S.A.

  • Construction Permit Design, decision on environmental conditions and multi-discipline detailed design for the preparation of a fly ash infrastructure (2017) 
  • Investor`s Technical Advisor during the public tender for the selection of General Contractor of the new supercritical power units with a capacity of 2 x 900 MWe, fired with hard coal (2008÷2011)
  • Detailed design for the upgrade of a common power center (2011)
  • Construction Permit Design and multi-discipline detailed design for the Main Control Center (2008).
  • Detailed design in the electrical part for the upgrading of control and protection systems in 6 kV and 0.4 kV common switchgears (2007)

Zofiówka CHP Plant - Spółka Energetyczna Jastrzębie S.A.
  • Preliminary design and Construction Permit Design for the construction of a 70 MWel power unit with fluidized bed boiler (2012)

Wybrzeże CHP Plants PGE Energia Ciepła

  • Basic engineering, Construction Permit Design and comprehensive detailed design for the construction of a FGD plant (wet method) at the Gdańsk CHP Plant (2013÷2015)
  • Multi-discipline technical documentation (detailed design and as-built documentation) for the redevelopment and extension of water and waste management at the Gdańsk CHP Plant (2004÷2008)
  • Development of the concept and detailed design of the safe unit shutdown system at the Gdańsk CHP Plant in case of emergency disconnection from the national power grid (2003)

Wrocław CHP Plant KOGENERACJA S.A. - PGE Energia Ciepła
  • Detailed design in the electrical part of the lighting systems for a boiler house and the steam boilers K-2 and K-3 (2016)
  • Basic engineering in the electrical part of a FGD installation`s electric power management (2015)
  • Detailed design in the electrical part of the main FGD`s 6 kV switchgear and 220V DC & 230V AC guaranteed power supply systems (2015)
  • Basic engineering, Construction Permit Design, comprehensive detailed design and as-built documentation for the construction of a FGD plant (2013÷2015)
 
Kraków CHP Plant - PGE Energia Ciepła

  • Multi-discipline detailed design for the modernization of a peak load boiler house`s electric power management (2017)
  • Detailed design in the electrical part of the power unit No. 4 excitation system (2017)
  • Multi-discipline detailed design including priced bills of quantities for the construction of a ventilation system for a coal supply gallery in the boiler building (2011)
  • Multi-discipline technical documentation (Construction Permit Design and detailed design) for the construction of a heat accumulator system (2009)

VEOLIA Energia Łódź
  • Detailed design in the electrical part of a power output lead from the power unit No. 2 at the Łódź 4 CHP Plant (2016)
  • Detailed design in the electrical part for the replacement  of a transformer TZ1 at the Łódź 3 CHP Plant (2016)
  • Detailed design in the electrical part for the modernization of a 15 kV switchgear at the Łódź 3 CHP Plant (2016)
Skawina Power Plant - CEZ Polska
  • Detailed design in the electrical part of the stand-by supply of the Section No. 1 from the 6 kV switchgears (2016)
Białystok CHP Plant - ENEA Group
  • Multi-discipline technical documentation (basic engineering, Construction Permit Design, detailed design and as-built documentation) for the construction of a biomass-fuelled system for renewable energy generation (2006÷2008)

NIKOLA TESLA B Power Plants (Obrenovac - Serbia)
  • Preliminary design, basic engineering, detailed design, assembly documentation and documentation for agreements with the Office of Technical Inspection related to the feed water pipeline feeding ECO1A superheater (modernization of a BB-1880 boiler (2011÷2012).

National Centre for Nuclear Research in Świerk City
  • Technical documentation for the replacement of a secondary circuit cooling system pipelines at the MARIA nuclear reactor (2016)
  • Construction permit design, detailed design for the modernization of a secondary circuit cooling system at the MARIA nuclear reactor (2014÷2015)

Radioactive Waste Neutralization Plant in Świerk City
  • "Concept of specialistic technologies and construction of non-standard technological devices intended for use" - for the needs of the construction of a new radioactive waste storage (2015)
Ignalina Nuclear Power Plant (Lithuania)
  • Multi-discipline technical documentation (Construction Permit Design, detailed design and as-built documentation) in the scope of works concerning the Visaginas heating boiler station (2003÷2005)

Gorzów CHP Plant - PGE GiEK S.A.
  • Technical documentation regarding the needs to adapt the devices and systems in explosion risk zones for the current requirements (2012)
  • Comprehensive technical documentation (basic engineering, detailed design and as-built documentation) for the electric systems of a gas and steam combined cycle unit at the Gorzów GHP Plant (1997÷1998)

Frantschach Świecie Paper Mill
  • Construction Permit Design for the construction of a circulating fluidized bed boiler (Q = 234 t/h), biomass-fuelled as part of the extension of the existing Polish Energy Partners S.A. CHP Plant with an output of 550 MWth (2002)



 
Strona główna Completed projects Major Design & Consulting Works

Snapshots

There are no translations available.

W dniach 5 – 7 czerwca 2013r. w Bełchatowie odbyła się XI Międzynarodowa Konferencja Naukowo-Techniczna „Elektrownie Cieplne, Eksploatacja – Modernizacje – Remonty”, poświęcona modernizacji i eksploatacji dużych bloków węglowych. Energoprojekt – Warszawa SA reprezentowali: Prezes Zarządu Andrzej Patrycy, który w sesji promocyjnej wygłosił referat prezentujący osiągnięcia oraz ofertę usług Spółki wraz z syntetyczną oceną polskiego sektora energetycznego (zarówno sytuacji obecnej, jak również w perspektywie najbliższych 10-15 lat, w tym – aspektów dotyczących rozwoju energetyki jądrowej w Polsce, wraz z prezentacją doświadczenia i możliwości Energoprojektu - Warszawa SA na tym polu) oraz Pan Adam Palmowski, który w sesji naukowo-technicznej wygłosił referat pn. „Doświadczenie doradcy technicznego inwestora w procesie uzgadniania wymagań technicznych dla fazy ofertowej i kontraktowej bloków dużej mocy na parametry nadkrytyczne, na węgiel brunatny i kamienny”, prezentujący powody (niezależne od zobowiązań naszego rządu w zakresie ochrony klimatu i środowiska naturalnego), wg których niezbędna jest budowa nowych mocy wytwórczych dla bezpiecznego funkcjonowania Krajowego Systemu Elektroenergetycznego.

email us: pulapka@energoprojekt.pl pulapka@energoprojekt.pl