Contracting party - Połaniec Power Plant – GDF Suez Energia Polska Group
Contract type
| Completion time
|
Completion of numerous works for the Flue Gas Desulphurization (FGD) system for 4 x 225 MW power units including:
- Preparing of a feasibility study for the construction of FGD system that covers:
- environmental protection matters
- desulphurization technology analysis
- matters related to limestone, lime, sorbent and sewage management
- layout with included FGD components
- economic part, analyzing the investment costs, operating costs, financing sources and analysis credit possibilities
- Acting as the Investor’s Technical Advisor when selecting the FGD technology supplier.
- ENERGOPROJEKT – WARSZAWA SA participated in the entire designing process related to the construction of Limestone Processing Plant and Lime Receiving and Storage System including the preparation of:
- technical concept
- basic engineering
- Construction Permit Design
- comprehensive detailed engineering and as-built documentation
ENERGOPROJEKT – WARSZAWA SA participated in the construction of this plant carrying out the project architects supervision.
|
1992-1999 |
Contracting party - RAFAKO S.A. Boiler Engineering Company
Contract type | Completion time |
Comprehensive technical documentation related to the FGD systems at the Bełchatów Power Plant covering the preliminary design and multi-discipline detailed engineering for the main part of the FGD system – absorbent center. |
1997-2001 |
Construction of FGD systems for the power units Nos. 1 - 4 (4 x 200 MW) at the Pątnów Power Plant
- basic engineering (including Construction Permit Design)
- multi-discipline detailed design
|
2005-2006
2006-2007
|
Construction of FGD system for the Ostrołęka „B” Power Plant
- Construction Permit Design
- multi-discipline detailed design
- as-built documentation
|
2005-2007 |
Development of FGD systems for the power units Nos. 8, 10, 11 i 12 (4 x 360 MW) at the Bełchatów Power Plant
- Construction Permit Design
- basic engineering and multi-discipline detailed design
|
2006-2007 |
Construction of FGD systems for the power units Nos. 3 and 4 (2 x 360 MW) at the Bełchatów Power Plant
- Construction Permit Design
- Preliminary design
- multi-discipline detailed design
- as-built documentation
|
2004-2007 |
Modernization of FGD systems for the power units Nos. 5 and 6 (2 x 360 MW) at the Bełchatów Power Plant
- Construction Permit Design and basic engineering
- detailed design and as-built documentation
|
2013-2014 |
Construction of FGD systems for the power units Nos. 1 and 2 (2 x 360 MW) at the Bełchatów Power Plant
- Construction Permit Design
- detailed design (electrical part and site arrangement)
|
2010-2012 |
Construction of FGD system for a 858 MW supercritical power unit at the Bełchatów Power Plant
- preliminary design
- multi-discipline detailed design for selected buildings and steel structures
- as-built documentation
|
2006-2009 |
Construction of FGD system (wet method) at the Gdańska CHP Plant - EDF Group
- Construction Permit Design and basic engineering
- detailed design and as-built documentation
|
2013-2015 |
Construction of FGD system (wet method) at the Wrocławskie CHP Plants KOGENERACJA S.A. - EDF Group
- Construction Permit Design and basic engineering
- detailed design and as-built documentation
|
2013-2015 |
Contracting party - PGE Bełchatów Power Plant
Contract type | Completion time |
- Technical and Economic Outlines for the construction of FGD systems at the Bełchatów Power Plant.
- Location study for the construction of FGD system for power units Nos. 8 & 9.
- Location study for the construction of FGD system for power units Nos. 11 & 12.
- Construction Permit Design – FGD system for power units Nos. 8, 10, 11, 12.
- Analysis of the possibilities of constructing FGD system for power units Nos. 1, 4.
- Study works and technical and economic analysis for taking the decision on FGD system construction (wet method) for power units Nos. 3 and 4.
- Location study for the construction of FGD system for power units Nos. 1 and 2.
- Environment Impact Assessment – construction of FGD system for power units Nos. 1 and 2.
|
1990
1992
1994
1994
2001
2003
2005
2008
|
Contracting party - ELBIS Ltd. (previous Bełchatów Power Plant II)
Contract type
| Completion time |
Acting as the Investor’s Technical Advisor for the turnkey projects (EPC services) for a 858 MW supercritical power unit located at the Bełchatów Power Plant.
- Scope of a new 858 MW power unit design covers necessary auxiliary systems, including: FGD system (selected technology – wet method)
|
2001-2005 |
Contracting party - Fortum Engineering Ltd. (Finland)
Contract type
| Completion time |
Development of technical documentation for the construction of FGD system for power units Nos. 9 & 10 (2 x 500 MW) at the Kozienice Power Plant including:
- complete detailed architectonic and civil engineering
- part of electrical systems
- design of process water supply installation for FGD system
|
2000 |
Contracting party - Kozienice Power Plant
Contract type
| Completion time
|
Acting as the Investor’s Technical, Economic and Legal Consultant for the Kozienice Power Plant during the public tender for the selection of General Contractor of FGD system for power units Nos. 4-8 (4 x 200 MW).
|
2002-2003 |
Contracting party - Pątnów – Adamów – Konin Power Plants Group
Contract type
| Completion time
|
Construction of FGD systems for power units Nos. 1-6 (6 x 200 MW) at the Pątnów Power Plant – technical concept
Development of Terms of Reference for the selection of General Contractor of a FGD system for the power units Nos. 1-4 (4 x 200 MW) at the Pątnów Power Plant.
Development of Terms of Reference for the selection of General Contractor of a Lime Dehydration and Storage System and a FGD sewage treatment system at the Pątnów Power Plant.
|
2001-2003
|
Contracting party - Energa Ostrołęka Power Plants Group
Contract type
| Completion time
|
Construction of a FGD system for the Ostrołęka „B” Power Plant.
- Feasibility study for the construction of FGD system under the Business Plan for the Energa Ostrołęka PPs
- Construction Permit Design, detailed engineering and as-built documentation
- Development of Terms of Reference for the selection of General Contractor of a FGD II
- Construction Permit Design for the construction of FGD II
|
2003
2005-2007
2013-2014
2014
|
Contracting party - EDF Group
Contract type
| Completion time
|
Feasibility study for the construction of a FGD system (wet method) at the Rybnik Power Plant |
2004 |
Contracting party - Vattenfall Heat Poland S.A
Contract type
| Completion time
|
Technical concept for the construction of FGD system for K1 boiler at the Siekierki CHP Plant. Development of the Terms of Reference for the tender for the selection of General Contractor of FGD system for K1 boiler – OP 230. Construction of FGD system for the Siekierki CHP Plant:
- technical concept with economic analysis
- development of an Application to obtain a decision of the land development conditions
- development of the ToR for the tender for the selection of General Contractor
|
2006-2007 |
|