Gas and Steam Combined Cycle Units |
![]() |
![]() |
![]() |
ENERGOPROJEKT - WARSZAWA SA has extensive experience and achievements in the development of designs, at various process stages, relating to the use of natural gas in the gas and steam combined cycle units and various sized boilers.
WE PROVIDE THE FOLLOWING SERVICES:1. Consulting services relating to the determination of optimal parameters of gas and steam combined cycle units.2. Consulting services relating to the form and mode of General Contractor tenders. 3. Consulting services relating to the selection of Strategic Investor (Business Plan). 4. Organisation of General Contractor tenders:
LIST OF MAJOR DESIGN WORKS RELATED TO THE CONSTRUCTION OF GAS AND STEAM COMBINED CYCLE UNITSDolna Odra Power Plants Group - PGE GiEK S.A. Feasibility study for the construction of two gas-steam combined cycle units with a capacity of 2 x 500 MWe (2017-2018) Stalowa Wola CHP Plant - PGNiG S.A Construction of a gas - steam combined cycle unit with a capacity of 450 MWe.
Pomorzany CHP Plant - PGE GiEK S.A. Construction Permit Design for the construction of a 240 MWe gas-steam combined cycle unit (2012) CEZ a.s. Multi-discipline study of 9 potential locations for the construction of a high capacity gas and steam combined cycle unit (2008) ANWIL S.A. - ORLEN Group
Gorzów CHP Plant - PGE GiEK S.A. Construction of a new GT8C gas turbine unit with electric output of 55 MWe and a heat recovery boiler fired with local nitrogenised gas. Complete detailed design and as-built documentation was developed for the electrical part in reference to the basic egineering (upon the supplier's request - ABB Zamech Ltd in 1998)
Construction of a gas-fired water boiler plant with net output of 160 MWth in Visaginas (Lithuania) Development of the technical part of the offer and joint participation in tender procedure with Elektrim - Megadex S.A. Multi-discipline technical documentation in areas of thermal process, civil engineering and architecture, electrical systems, utility systems, elevators and overhauls, control and instrumentation, (upon request - SNC LAVALIN) including:
Lublin - Wrotków CHP Plant - PGE GiEK S.A. Construction of a gas and steam combined cycle unit with a capacity of 235 MWe and 150 MWth at the Lublin-Wrotków CHPP
Stalowa Wola Power Plant - TAURON Wytwarzanie
Rzeszów CHP Plant - PGE GiEK S.A. Construction of a gas and steam combined cycle unit with a capacity of 101 MWe and 76 MWth at the Rzeszów CHPP
Municipal Heat Distribution Company in Tarnów City Construction of a gas turbine with a net electric capacity of 3.73 MW operating with a heat recovery boiler with total heat output of 10 MW at the Piaskówka thermal plant.
Municipal Heat Distribution Company in Włocławek City Concept for the development of an electricity and heat co-generation source based on gas engines (2000) Zielona Góra CHP Plant - EDF Group Feasibility study for the expansion of the Zielona Góra CHPP. The following works were performed (1998):
Elbląg CHP Plant - ENERGA Kogeneracja Concept for the modernisation and reconstruction of the power management system in the combined heat and power plant - construction of a gas and steam combined cycle unit with a capacity of 150 MWe. Application for a decision on land development and site planing for the gas and steam combined cycle unit and Environmental Impact Assessment (1996-1997) POLISH POWER GRID CO. Opportunity study for the construction of a pumped-storage gas plant in the area of Mogilno City (1997) TORUŃ CHP Plant - Toruńska Energetyka Cergia S.A. Concept for the maintenance and development of the combined heat and power plant, including the construction of a gas and steam combined cycle unit with a capacity of 150 MWe. Preparatory works and organisation of a tender for the selection of the General Contractor for the construction of a gas and steam combined cycle unit at the Toruń CHPP (1996) |
There are no translations available. ENERGOPROJEKT – WARSZAWA SA jako Generalny Realizator Inwestycji wybrany w drodze publicznego postępowania przetargowego wykonał, dla TAURON Ekoenergia Sp. z o.o. w okresie dwóch lat poczynając od 27 listopada 2012 r. kompleksową modernizację Elektrowni Wodnej OTMUCHÓW (6,6MW) wraz z wymianą turbozespołów dla uzyskania większej mocy, większej sprawności i przedłużenia zdolności produkcyjnej na dalsze kilkadziesiąt lat eksploatacji. |