Hydro Power Plants PDF Print E-mail

Power plant
OutputGen. HeadTurbinesYear of
start-up 
Remarks
MW GWh/
a
m NumTypeManufact.
DYCHÓW 79.5 96 30 2
2
K
P
LMZ/V
EW/V
1950
Hydropower plant with a pumping unit. Modernization 1997 ÷ 1999. Final modernization (by Energoprojekt 2000 ÷ 2005) - General Contractor.
1
2
K
P
LMZ/V SFUP/V 1965
CZCHÓW 8 32 9 2 K V+Ch 1954 Modernization 2004 ÷ 2005.
PORĄBKA 12.5 25 22 2
1
K
F
V 1954 Modernization 1995 ÷ 1996 by Energoprojekt - General Contractor.
PRZEWÓZ 1.8 13 4 2 K V 1956 Modernization 1987 ÷ 1988.
OLSZNA 1.8 4.5 6.5 2 K CKD 1957  
WAŁY ŚLĄSKIE 9.8 45 5.5 4 K CKD 1958 Modernization 1994 ÷ 1995.
KORONOWO 26 42 25 2 K CKD 1959 Hydropower plant with an earth dam.
TRYSZCZYN 3.3 8 4 2 K G-M 1960  
MYCZKOWCE 8.4 30 22.8 2 K G-M/V 1961 Hydropower plant with an earth dam. Modernization 1998 ÷ 2000 by Energoprojekt - General Contractor.
DĄBIE 2.94 13 3.7 2 K G-M 1962  
SOLINA 136
200.2
112
200
60 2
2
F PT-F CKD/V CKD/S 1968 Hydropower plant with a pumping unit and concrete dam. Modernization 2000 ÷ 2003 (capacity increased up to 200.2 MW).
WŁOCŁAWEK 160 640 10 6 K ChGZ 1970 Modernization.
ŻYDOWO 150 193 81 2
1
PT-F F CKD 1970 Pumped-storage hydropower plant. Modernization 2000 ÷ 2012 by Energoprojekt - General Contractor.
GUBIN 1.16 5.3 4.2 2 K SMW 1973 Modernization of two hydro turbine sets.
PORĄBKA-ŻAR 500 640 439 4 PT-F B+CDK 1979 Pumped-storage hydropower plant. Reconstruction of the upper reservoir in 1995 by Energoprojekt - General Contractor.
ŻARNOWIEC 680 1165 119.3 4 PT-F CKD 1982 Pumped-storage hydropower plant. Reconstruction of the upper reservoir in 2006. Modernization of 4 hydro turbine sets by Energoprojekt (2007÷2011) - General Contractor.
MŁOTY 750 1200 271.6 3 PT-F (CKD) planned Pumped-storage hydropower plant.
CZORSZTYN - NIEDZICA 93 128 46.1 2 PT-DR CKD 1997 Hydropower plant with a pumping unit.
SROMOWCE WYŻNE 2.08 7.5 9.5 4 FL FL 1994 Design and development by Energoprojekt - General Contractor.
JEZIORSKO 4.9 21 6.5 2 K ZRE 1994  
SOBOLICE 0.66 3.9 3.2 2 K D 1993 Modernization.
KLICZKÓW 0.64 2.65 5.9 2 FL FL 1994  
DOBCZYCE 2.24 6.8 28.6 2 K CKD 1993  
KLIMKÓWKA 13 5.4 30.5 1 K CKD 1994  
MAŁOMICE 0.80 3.1 2.7 2 K D 1992 Modernization.
MAZIARNIA 0,05 0.3 6.9 1 B-M ZRE 1985  
BUKÓWKA 0.84 5.4 5.6 2 FL FL 1992  
ŚWINNA PORĘBA 4.0
0.1 
18 37.6 2
K
RK 
ZRE
ZRE 
design Hydropower plant and water reservoir - under construction.
NYSA 0.27 1.8 3.5 1 FL FL 1993 Replacement of 1 hydro turbine-generator set by Energoprojekt - General Contractor.
TOPOLA 1.56 6.85 6.5 3 FL FL 2002 Energoprojekt - General Contractor.
ZASIEKI 0.82 5 3.7 2 K D 1996 Modernization of hydropower plant and weir in 2004.
SIEMIANÓWKA 0.16 1.1 7 2 FL FL 1996 Design, site supervision and start-up.
GORZUPIA 1.68 10.1 4.6 4 FL FL 1998  
ŻAGAŃ I 0.9 4.8 2.8 3 RK M 1998 Modernization.
KĘPKA 0.52 2.3 4.4 2 K ZRE 1998 Reconstruction.
SZPROTAWA 0.63 3.7 2.9 2 RK M 1998  
MALCZYCE 9.0 45.7 5.8 3 RKG - planned
Construction Permit Design - 2006. Detailed design - 2007. Under construction (2005 ÷2015) by Energoprojekt - General Contractor.
ROŻNÓW 50 102 29.7 4 K EW

2000

Modernization of 4 hydro turbine sets by Energoprojekt (1996÷2000) - General Contractor.
PRZYSIEKA 1.3 6.57 5.4 2 RK S 2001  
RAKOWICE 1.8 9.1 8.6 2 RK M 2005  
TRZEBIATÓW 0.25 1.9 2.6 1 RK M 2001  
JANUSZKOWICE 1.4 7.1 2.6 2 RK VA - TECH 2003  
KRĘPNA 1.26 7.0 2.5 2 RK M 2004  
KRAPKOWICE 1.26 7.28 2.6 2 RK M 2006  
ZIELISKO 1.36 5.8 3.6 3 RK M 2002 Replacement of 2 hydro turbine-generator sets and modernization of the third one.
WIELOWIEŚ KLASZTORNA 0.7 3.2 10.5 2 - - design Hydropower plant with a lifting weir.
SMOLICE 1.3 6.9 3.6 2 RK M 2006
BOBROWICE III 1.1 5.6 9.6 2 - - design Concept development.
DOBRZEŃ 1.6 10.0 2.1 2 RK M 2008
CZANIEC 0,4 1,3 9,3 1 RK - design
JANOWICE 1.52 10.65 3.7 4 RK GEG 2011 Modernization. Replacement of 4 hydro turbine-generator sets.
BRZEG 0.4 2.0 2.5 1 K GEG 2012 Modernization. Replacement of 1 hydro turbine-generator set and process equipment.
BYSTRZYCA KŁODZKA 0.4 1.3 6.5 2 - - design Modernization.
RZESZÓW 0.66 3.0 6.0 1 K M 2012 Hydropower plant with a fish pass by the existing stage.
POŁOCKA (Białoruś) 20.0 90.0 7.7 5 RKG - design Construction Permit Design.
RADUSZEC STARY 3.0 15.0 4.8 2 K V design Modernization.
CHAŃCZA 0.16 1.1 12.0 1 RK - 2013 Installation of a small hydro turbine-generator set.
PILCHOWICE I (7.58)
11.8 
  35.0 4
  ZRE
design -
under construction 
Modernization. Increase of installed capacity. Replacement of four hydro turbine-generator sets. Refit of two hydro turbine-generator sets.
BOBROWICE I (2.42)
3.5 
  14.0 2
K
GEG
design - under construction Modernization. Increase of installed capacity. Replacement of two hydro turbine-generator sets (1 x 1.52 MW). Refit of third one.
OTMUCHÓW (4.8)
6.0 
  18.0 2 K CKD 2014 Modernization. Replacement of 2 hydro turbine-generator sets. Increase of installed capacity.
BRANIEWO 0.6 1.9 2.5 2 K
- design Concept of modernization.
OŁAWA           M 2013 Construction Permit Design. Technical Adviser services.
DĘBE 20.0 91.0 5.7 4 K G-M design Modernization of electrical devices.
SZKLARSKA PORĘBA I 0.74 3.0 45.5 2 F ZRE design Modernization of hydropower plant.
GŁĘBINÓW 3.04   9.5 2 RK G-M design Modernization of hydropower plant.
MARSZOWICE 0.38 1.12 3.75 2 F V design Multi-variant concept - modernization or replacement of devices.

Specification
K Kaplan turbine
F Francis Turbine
B-M Bank-Michell turbine
PT-F Francis reversible pump turbine
PT-DR Deriaz reversible pump turbine
FL FLYGT hydro turbine set
P pumps
RK Full Kaplan turbine
RKG Full Kaplan turbine with inner generator
Turbine Manufacturer
CKD
CKD Blansko - Czech Republic
B Boving - England
V Voith - Austria
CH
Charmille - Switzerland
EW
Escher Wyss - Switzerland
G-M
Ganz Mavag - Hungary
LMZ
LMZ Petersburg - Russia
ChGZ
ChGZ Charkov - Ukraine
ZRE
Zakłady Remontowe Energetyki Gdańsk - Poland
D Dozamet Nowa Sól - Poland
SMW Stocznia Marynarki Wojennej, Gdynia - Poland
SFUP Świdnicka Fabryka Urządzeń Przemysłowych - Poland
FL ITT Flygt - Sweden
M MAVEL - Czech Republic
S Sulzer Hydro, Ravensburg - Germany
GEG Gajek Engineering - Poland

 
Strona główna Completed projects Hydro power plants

Snapshots

There are no translations available.

W lipcu 2008 roku Energa Zakład Elektrowni Wodnych Sp. z o.o. ogłosił przetarg nieograniczony na:
„Pełnienie czynności zastępstwa inwestycyjnego przy realizacji inwestycji pn.: ”Modernizacja Elektrowni Szczytowo – Pompowej Żydowo” oraz opracowanie kompleksowej, wielobranżowej dokumentacji technicznej modernizacji Elektrowni Szczytowo – Pompowej Żydowo wraz z uzyskaniem ostatecznej decyzji pozwolenia na budowę oraz z nadzorem autorskim”.

 

email us: pulapka@energoprojekt.pl pulapka@energoprojekt.pl