Energoprojekt - Warszawa SA

Polish (Poland)English (United Kingdom)
FGD Systems PDF Print E-mail

Contracting party - Połaniec Power Plant – Electrabel Group

Contract type
Completion
time
Completion of numerous works for the Flue Gas Desulphurization (FGD) system for 4 x 225 MW power units including:
  • Preparing of a feasibility study for the construction of FGD system that covers:
    • environmental protection matters,
    • desulphurization technology analysis,
    • matters related to limestone, lime, sorbent and sewage management,
    • layout with included FGD components,
    • economic part, analyzing the investment costs, operating costs, financing sources and analysis credit possibilities.
  • Acting as the Investor’s Technical Advisor when selecting the FGD technology supplier.
  • „ENERGOPROJEKT – WARSZAWA” S.A. participated in the entire designing process related to the construction of Limestone Processing Plant and Lime Receiving and Storage System including the preparation of:
    • technical concept,
    • basic engineering,
    • Building Permit Documentation,
    • comprehensive detailed engineering and as-built documentation.
„ENERGOPROJEKT – WARSZAWA” S.A. participated in the construction of this plant carrying out the project architects supervision.
1992-1999

Contracting party - RAFAKO S.A. Boiler Engineering Company

Contract typeCompletion
time
Comprehensive technical documentation related to FGD systems in the Bełchatów Power Plant covering the preliminary design and multi-discipline detailed engineering for the main part of the FGD system – absorbent center. 1997-2001
Construction of FGD systems for power units no. 1¸4 (4 x 200 MW) in the Pątnów Power Plant.
  • basic engineering (including Building Permit Documentation),
  • multi-discipline detailed engineering.
2005-2006
2006-2007
Construction of FGD system for the Ostrołęka „B” Power Plant.
  • Building Permit Documentation,
  • multi-discipline detailed engineering,
  • as-built documentation.
2005-2007
Development of FGD systems for power units no. 8, 10, 11 i 12 (4 x 360 MW) in the Bełchatów Power Plant.
  • Building Permit Documentation,
  • basic engineering and multi-discipline detailed engineering.
2006-2007
Construction of FGD systems for power units no. 3 and 4 (2 x 360 MW) in the Bełchatów Power Plant.
  • Building Permit Documentation,
  • Preliminary design,
  • multi-discipline detailed engineering,
  • as-built documentation.
2004-2007
Construction of FGD system for a 858 MW supercritical power unit in the Bełchatów Power Plant.
  • preliminary design,
  • multi-discipline detailed engineering for selected buildings and steel structures,
  • as-built documentation
2006-2009

Contracting party - PGE Bełchatów Power Plant

Contract typeCompletion
time
  • Technical and Economic Outlines for the construction of FGD systems in the Bełchatów Power Plant.
  • Location study for the construction of FGD system for power units no. 8 & 9.
  • Location study for the construction of FGD system for power units no. 11 & 12.
  • Building Permit Documentation – FGD system for power units no. 8, 10, 11, 12.
  • Analysis of the possibilities of constructing FGD system for power units no. 1¸4
  • Study works and technical and economic analysis for taking the decision on FGD system construction (wet method) for power units 3 and 4.
  • Location study for the construction of FGD system for power units no. 1 and 2.
  • Environment Impact Assessment – construction of FGD system for power units no. 1 and 2
1990
1992
1994
1994
2001
2003

2005
2008


Contracting party - ELBIS Ltd. (previous Bełchatów Power Plant II)

Contract type
Completion
time
Acting as the Investor’s Technical Advisor for the turnkey projects (EPC services) for a 858 MW supercritical power unit located at the Bełchatów Power Plant.
  • Scope of a new 858 MW power unit design covers necessary auxiliary systems, including: FGD system (selected technology – wet method).
2001-2005

Contracting party - Fortum Engineering Ltd. (Finland)

Contract type
Completion
time
Development of technical documentation for the construction of FGD system for power units no. 9 & 10 (2 x 500 MW) in the Kozienice Power Plant including:
  • complete detailed architectonic and civil engineering,
  • part of electrical systems,
  • design of process water supply installation for FGD system.
2000

Contracting party - Kozienice Power Plant

Contract type
Completion time
Acting as the Investor’s Technical, Economic and Legal Consultant for the Kozienice Power Plant during the public tender for the selection of General Contractor of FGD system for power units no. 4 ¸ 8 (4 x 200 MW).
2002-2003

Contracting party - Pątnów – Adamów – Konin Power Plants Group

Contract type
Completion time
Construction of FGD systems  for power units no. 1¸6 (6 x 200 MW) in the Pątnów Power Plant – technical concept

Development of the Terms of Reference (ToR) for the tender for the selection of General Contractor of FGD system for power units no. 1¸4 (4 x 200 MW) in the Pątnów Power Plant.

Development of the ToR for the tender for the selection of General Contractor of Lime Dehydration and Storage System and FGD sewage treatment system in the Pątnów Power Plant.

2001-2003


Contracting party - Energa Ostrołęka Power Plants Group

Contract type
Completion
time
Construction of FGD system for the Ostrołęka „B” Power Plant.
  • Feasibility study for the construction of FGD system under the Business Plan for the Ostrołęka Power Plants Group,
  • Building Permit Documentation, detailed engineering and as-built documentation.

2003
2005-2007


Contracting party - Rybnik Power Plant

Contract type
Completion
time
Feasibility study for the construction of FGD system (wet method). 2004

Contracting party - Vattenfall Heat Poland S.A

Contract type
Completion
time
Technical concept for the construction of FGD system  for K1 boiler in the Siekierki CHP Plant.
Development of the Terms of Reference for the tender for the selection of General Contractor of FGD system for K1 boiler – OP 230.
Construction of FGD system for the Siekierki CHP Plant:
  • technical concept with economic analysis,
  • development of an Application to obtain a decision of the land development conditions,
  • development of the ToR for the tender for the selection of General Contractor.
2006-2007

 
Strona główna Completed projects FGD Systems

Snapshots

There are no translations available.

W lipcu 2008 roku Energa Zakład Elektrowni Wodnych Sp. z o.o. ogłosił przetarg nieograniczony na:
„Pełnienie czynności zastępstwa inwestycyjnego przy realizacji inwestycji pn.: ”Modernizacja Elektrowni Szczytowo – Pompowej Żydowo” oraz opracowanie kompleksowej, wielobranżowej dokumentacji technicznej modernizacji Elektrowni Szczytowo – Pompowej Żydowo wraz z uzyskaniem ostatecznej decyzji pozwolenia na budowę oraz z nadzorem autorskim”.

 

email us: pulapka@energoprojekt.pl pulapka@energoprojekt.pl