Contracting party - Połaniec Power Plant – Electrabel Group
Contract type
| Completion time
|
Completion of numerous works for the Flue Gas Desulphurization (FGD) system for 4 x 225 MW power units including:
- Preparing of a feasibility study for the construction of FGD system that covers:
- environmental protection matters,
- desulphurization technology analysis,
- matters related to limestone, lime, sorbent and sewage management,
- layout with included FGD components,
- economic part, analyzing the investment costs, operating costs, financing sources and analysis credit possibilities.
- Acting as the Investor’s Technical Advisor when selecting the FGD technology supplier.
- „ENERGOPROJEKT – WARSZAWA” S.A. participated in the entire designing process related to the construction of Limestone Processing Plant and Lime Receiving and Storage System including the preparation of:
- technical concept,
- basic engineering,
- Building Permit Documentation,
- comprehensive detailed engineering and as-built documentation.
„ENERGOPROJEKT – WARSZAWA” S.A. participated in the construction of this plant carrying out the project architects supervision.
|
1992-1999 |
Contracting party - RAFAKO S.A. Boiler Engineering Company
| Contract type | Completion time |
| Comprehensive technical documentation related to FGD systems in the Bełchatów Power Plant covering the preliminary design and multi-discipline detailed engineering for the main part of the FGD system – absorbent center. |
1997-2001 |
Construction of FGD systems for power units no. 1¸4 (4 x 200 MW) in the Pątnów Power Plant.
- basic engineering (including Building Permit Documentation),
- multi-discipline detailed engineering.
|
2005-2006 2006-2007 |
Construction of FGD system for the Ostrołęka „B” Power Plant.
- Building Permit Documentation,
- multi-discipline detailed engineering,
- as-built documentation.
|
2005-2007 |
Development of FGD systems for power units no. 8, 10, 11 i 12 (4 x 360 MW) in the Bełchatów Power Plant.
- Building Permit Documentation,
- basic engineering and multi-discipline detailed engineering.
|
2006-2007 |
Construction of FGD systems for power units no. 3 and 4 (2 x 360 MW) in the Bełchatów Power Plant.
- Building Permit Documentation,
- Preliminary design,
- multi-discipline detailed engineering,
- as-built documentation.
|
2004-2007 |
Construction of FGD system for a 858 MW supercritical power unit in the Bełchatów Power Plant.
- preliminary design,
- multi-discipline detailed engineering for selected buildings and steel structures,
- as-built documentation
|
2006-2009 |
Contracting party - PGE Bełchatów Power Plant
| Contract type | Completion time |
- Technical and Economic Outlines for the construction of FGD systems in the Bełchatów Power Plant.
- Location study for the construction of FGD system for power units no. 8 & 9.
- Location study for the construction of FGD system for power units no. 11 & 12.
- Building Permit Documentation – FGD system for power units no. 8, 10, 11, 12.
- Analysis of the possibilities of constructing FGD system for power units no. 1¸4
- Study works and technical and economic analysis for taking the decision on FGD system construction (wet method) for power units 3 and 4.
- Location study for the construction of FGD system for power units no. 1 and 2.
- Environment Impact Assessment – construction of FGD system for power units no. 1 and 2
|
1990 1992 1994 1994 2001 2003
2005 2008
|
Contracting party - ELBIS Ltd. (previous Bełchatów Power Plant II)
Contract type
| Completion time |
Acting as the Investor’s Technical Advisor for the turnkey projects (EPC services) for a 858 MW supercritical power unit located at the Bełchatów Power Plant.
- Scope of a new 858 MW power unit design covers necessary auxiliary systems, including: FGD system (selected technology – wet method).
|
2001-2005 |
Contracting party - Fortum Engineering Ltd. (Finland)
Contract type
| Completion time |
Development of technical documentation for the construction of FGD system for power units no. 9 & 10 (2 x 500 MW) in the Kozienice Power Plant including:
- complete detailed architectonic and civil engineering,
- part of electrical systems,
- design of process water supply installation for FGD system.
|
2000 |
Contracting party - Kozienice Power Plant
Contract type
| Completion time
|
Acting as the Investor’s Technical, Economic and Legal Consultant for the Kozienice Power Plant during the public tender for the selection of General Contractor of FGD system for power units no. 4 ¸ 8 (4 x 200 MW).
|
2002-2003 |
Contracting party - Pątnów – Adamów – Konin Power Plants Group
Contract type
| Completion time
|
Construction of FGD systems for power units no. 1¸6 (6 x 200 MW) in the Pątnów Power Plant – technical concept
Development of the Terms of Reference (ToR) for the tender for the selection of General Contractor of FGD system for power units no. 1¸4 (4 x 200 MW) in the Pątnów Power Plant.
Development of the ToR for the tender for the selection of General Contractor of Lime Dehydration and Storage System and FGD sewage treatment system in the Pątnów Power Plant.
|
2001-2003
|
Contracting party - Energa Ostrołęka Power Plants Group
Contract type
| Completion time
|
Construction of FGD system for the Ostrołęka „B” Power Plant.
- Feasibility study for the construction of FGD system under the Business Plan for the Ostrołęka Power Plants Group,
- Building Permit Documentation, detailed engineering and as-built documentation.
|
2003 2005-2007 |
Contracting party - Rybnik Power Plant
Contract type
| Completion time
|
| Feasibility study for the construction of FGD system (wet method). |
2004 |
Contracting party - Vattenfall Heat Poland S.A
Contract type
| Completion time
|
Technical concept for the construction of FGD system for K1 boiler in the Siekierki CHP Plant. Development of the Terms of Reference for the tender for the selection of General Contractor of FGD system for K1 boiler – OP 230. Construction of FGD system for the Siekierki CHP Plant:
- technical concept with economic analysis,
- development of an Application to obtain a decision of the land development conditions,
- development of the ToR for the tender for the selection of General Contractor.
|
2006-2007 |
|